VII M12
Add to comparison
Add the vehicle with its basic configuration to comparison Remove the vehicle from comparison Add the vehicle with its current configuration to comparison Remove the vehicle from comparison

M12 U.S.A.

Add to comparison Vehicle added to comparison Add vehicle configuration to comparison Vehicle configuration added to comparison
Add the vehicle with its basic configuration to comparison Remove the vehicle from comparison Add the vehicle with its current configuration to comparison Remove the vehicle from comparison

Development of the SPG started in the second half of 1941. The prototype underwent trials on February 12, 1942 and saw service in July 1942. The Pressed Steel Car Company produced 100 vehicles. Baldwin Locomotive Works modified the SPGs and re-equipped some M30 carriers. The vehicle saw service in the field artillery battalions and was used by the U.S.A. forces in Western Europe.

Nation U.S.A. U.S.A.
Tier Tier VII
Type SPGs SPGs
Cost Credits 1,400,000 Experience 59,400

Crew

Crew Member Commander
Crew Member Gunner
Crew Member Driver
Crew Member Radio Operator
Crew Member Loader
Crew Member Loader

Characteristics

Characteristics

FirepowerFirepower

/ / / / HP Damage
/ / / / mm Armor Penetration
rounds/min Rate of Fire
(HP/min) Damage per Minute
s Aiming Time
m Dispersion at 100 m
pcs Ammo Capacity

MobilityMobility

/ / t Weight/Load Limit
hp Engine Power
hp/t Specific Power
km/h Top Speed
deg/s Traverse Speed
deg/s Turret Traverse Speed

SurvivabilitySurvivability

HP Hit Points
/ / mm Hull Armor
/ / / / mm Turret Armor

SpottingSpotting

m View Range
m Signal Range

Characteristics are specified for a vehicle with crew members trained to 100%.

Close